
Smart Utilities
Kampala-based commercial coordination, technical supply, Uganda-based manufacturing and blending, field mobilisation and project delivery.
Explore Uganda capacity
Uganda & Tanzania / Honest Inspection Services
Intelligent pigging, inspection technology and local execution support across Uganda and Tanzania’s heated crude oil pipeline corridor.
Honest Inspection Services / A division of Smart Utilities
Honest Inspection Services delivers all Smart Utilities asset integrity and maintenance services. Our intelligent pigging offering connects specialist ILI technology with project coordination, mobilisation, logistics and site support in Uganda and Tanzania.
We develop the inspection approach with specialist tool providers and qualified analysts, from pipeline readiness and safe field operations to evaluated inspection data. Smart Utilities coordinates Uganda requirements from Kampala; Oros Logistics Tanzania Ltd supports Tanzania commercial and logistics delivery from Dar es Salaam. Technology, personnel and project qualifications are confirmed for each engagement.
Explore our complementary EACOP chemicals offering
Kampala-based commercial coordination, technical supply, Uganda-based manufacturing and blending, field mobilisation and project delivery.
Explore Uganda capacity
Dar es Salaam-based commercial and project coordination, imports, warehousing, specialised logistics and field-delivery support for Tanzania requirements.
Explore Tanzania capacityFrom readiness to integrity insight
An integrated service scope, with inspection technology selected to suit the pipeline and required detection performance.
Pre-inspection cleaning, gauging and readiness planning for waxy crude conditions, variable internal diameters and the selected inspection spread.
Cleaning / GaugingDeformation inspection to identify and characterise pipeline geometry features, with tool selection matched to the line’s operating envelope.
Geometry / DeformationHigh-resolution metal-loss and crack inspection using contractor-proposed MFL, UT or EMAT technologies, qualified for the required detection scope.
MFL / UT / EMATHigh-accuracy IMU/DGPS mapping, above-ground markers and acoustic or electromagnetic pig tracking, with controlled launcher and receiver operations.
IMU / DGPS / TrackingData processing, anomaly characterisation, defect sizing and Fitness-for-Service assessments prepared for integration with EACOP’s pipeline integrity management system.
Analysis / FFS / PIMSUganda & cross-border inspection context
Our pipeline inspection planning considers two mainline segments and the optional Tilenga feeder line. Segment 2 continues across the border into Tanzania.
Uganda
Uganda
9 main line block valves
Uganda
Tanzania
11 main line block valves · Kagera River HDD crossing
Uganda
Uganda
6 main line block valves
Inspection segment schematic · Not a geographic map · Distances describe the pipeline service context.
Tanzania inspection context
Tanzania coverage includes the cross-border approach to PS3 and approximately 1,037.3 km across the six segments from PS3 to the Marine Storage Terminal at Tanga. Inspection spreads, tracking and data evaluation are coordinated for each segment.
10 main line block valves
10 main line block valves
6 main line block valves
12 main line block valves
8 main line block valves
6 main line block valves · Sigi River HDD crossing
PS: Pumping Station · PRS: Pressure Reduction Station · MST: Marine Storage Terminal · Schematic, not to scale.
Designed around demanding conditions
Heated, waxy crude pipelines require careful tool selection. The reference operating envelope below guides technical discussions; suitability is confirmed for each engagement.
Required tool temperature rating
Continuous logging autonomy
Low pipeline operating velocity
Internal diameter range across the stated wall sections
The reference envelope includes waxy crude conditions up to 63°C WAT, multi-diameter adaptability and compliance with POF 2021, API 1163, ASNT ILI-PQ and ASME B31.4/B31G.
Specialist technology / Local execution
Honest Inspection Services · A division of Smart Utilities
We welcome discussions with pipeline operators, project teams and specialist ILI providers with relevant heated or high-wax crude pipeline experience.
Discuss a technical partnershipStart a technical conversation
Share your tool specifications, relevant pipeline experience, proposed personnel and mobilisation availability.