Smart Utilities · EACOP pipeline servicesmk@smartutilitiesafrica.com
Intelligent inspection pig beside an industrial pipeline launcher

Uganda & Tanzania / Honest Inspection Services

Pipeline intelligence.
Integrity from within.

Intelligent pigging, inspection technology and local execution support across Uganda and Tanzania’s heated crude oil pipeline corridor.

Inspection technology

Honest Inspection Services / A division of Smart Utilities

Global inspection expertise.
Uganda & Tanzania coordination.

Honest Inspection Services delivers all Smart Utilities asset integrity and maintenance services. Our intelligent pigging offering connects specialist ILI technology with project coordination, mobilisation, logistics and site support in Uganda and Tanzania.

We develop the inspection approach with specialist tool providers and qualified analysts, from pipeline readiness and safe field operations to evaluated inspection data. Smart Utilities coordinates Uganda requirements from Kampala; Oros Logistics Tanzania Ltd supports Tanzania commercial and logistics delivery from Dar es Salaam. Technology, personnel and project qualifications are confirmed for each engagement.

Explore our complementary EACOP chemicals offering
Chemical technicians reviewing a sample in a blending and packing facility
Uganda · Chemical operations
UG / Uganda

Smart Utilities

Kampala-based commercial coordination, technical supply, Uganda-based manufacturing and blending, field mobilisation and project delivery.

Explore Uganda capacity
Logistics professionals checking delivery documentation in a warehouse yard
Tanzania · Project logistics
TZ / Tanzania

Oros Logistics Tanzania Ltd

Dar es Salaam-based commercial and project coordination, imports, warehousing, specialised logistics and field-delivery support for Tanzania requirements.

Explore Tanzania capacity

From readiness to integrity insight

One inspection campaign.
Five connected stages.

An integrated service scope, with inspection technology selected to suit the pipeline and required detection performance.

01

Prepare the line

Pre-inspection cleaning, gauging and readiness planning for waxy crude conditions, variable internal diameters and the selected inspection spread.

Cleaning / Gauging
02

Inspect geometry

Deformation inspection to identify and characterise pipeline geometry features, with tool selection matched to the line’s operating envelope.

Geometry / Deformation
03

Assess metal & cracks

High-resolution metal-loss and crack inspection using contractor-proposed MFL, UT or EMAT technologies, qualified for the required detection scope.

MFL / UT / EMAT
04

Map & track

High-accuracy IMU/DGPS mapping, above-ground markers and acoustic or electromagnetic pig tracking, with controlled launcher and receiver operations.

IMU / DGPS / Tracking
05

Turn data into decisions

Data processing, anomaly characterisation, defect sizing and Fitness-for-Service assessments prepared for integration with EACOP’s pipeline integrity management system.

Analysis / FFS / PIMS

Uganda & cross-border inspection context

Mainline & Tilenga feeder.
From Kabaale to PS3.

Our pipeline inspection planning considers two mainline segments and the optional Tilenga feeder line. Segment 2 continues across the border into Tanzania.

Mainline / Segment 1184.5 km
PS1

Kabaale

Uganda

PS2

Sembabule

Uganda

9 main line block valves

Mainline / Segment 2220.8 km
PS2

Sembabule

Uganda

PS3

Muleba

Tanzania

11 main line block valves · Kagera River HDD crossing

Optional / Tilenga feeder97.4 km
CPF

Tilenga

Uganda

PS1

Kabaale

Uganda

6 main line block valves

Inspection segment schematic · Not a geographic map · Distances describe the pipeline service context.

Tanzania inspection context

Six mainline segments.
Through to Tanga.

Tanzania coverage includes the cross-border approach to PS3 and approximately 1,037.3 km across the six segments from PS3 to the Marine Storage Terminal at Tanga. Inspection spreads, tracking and data evaluation are coordinated for each segment.

Tanzania / Segment 3204.6 km
From

PS3

To

PS4

10 main line block valves

Tanzania / Segment 4206.6 km
From

PS4

To

PS5

10 main line block valves

Tanzania / Segment 5114.6 km
From

PS5

To

PS6

6 main line block valves

Tanzania / Segment 6240.4 km
From

PS6

To

PRS1

12 main line block valves

Tanzania / Segment 7158.5 km
From

PRS1

To

PRS2

8 main line block valves

Tanzania / Segment 8112.6 km
From

PRS2

To

MST

6 main line block valves · Sigi River HDD crossing

PS: Pumping Station · PRS: Pressure Reduction Station · MST: Marine Storage Terminal · Schematic, not to scale.

Designed around demanding conditions

Heated crude.
Low velocity. Variable bore.

Heated, waxy crude pipelines require careful tool selection. The reference operating envelope below guides technical discussions; suitability is confirmed for each engagement.

70°C

Required tool temperature rating

300h

Continuous logging autonomy

0.21–0.24m/s

Low pipeline operating velocity

~576–589mm

Internal diameter range across the stated wall sections

The reference envelope includes waxy crude conditions up to 63°C WAT, multi-diameter adaptability and compliance with POF 2021, API 1163, ASNT ILI-PQ and ASME B31.4/B31G.

Specialist technology / Local execution

Plan the inspection.
Coordinate the delivery.

Honest Inspection Services · A division of Smart Utilities

We welcome discussions with pipeline operators, project teams and specialist ILI providers with relevant heated or high-wax crude pipeline experience.

Discuss a technical partnership

Start a technical conversation

Bring the technology.
Build the local execution plan.

Share your tool specifications, relevant pipeline experience, proposed personnel and mobilisation availability.

Contact the Smart Utilities team +256 752 169 394